Remit Urgent Messaging NAM Groningen

Here you find all Urgent Messages until 14-12-2021.


29-11-2021 14:30:23 Revision: 3

Inactive GRIJPSKE0000000000211129_003

Unplanned 29/11/2021 07:50 - 29/11/2021 14:32

Technical Capacity: 700,00 GWh/d Unavailable Capacity: 298,00 GWh/d Available Capacity: 402,00 GWh/d

Due to technical problems

Problem is solved.....100% capacity


29-11-2021 10:20:27 Revision: 2
GRIJPSKE0000000000211129_002
Unplanned 29/11/2021 07:50 - 01/12/2021 16:50

Technical Capacity: 700,00 GWh/d Unavailable Capacity: 298,00 GWh/d Available Capacity: 402,00 GWh/d

Due to technical problems

Vendor invited on-site....ETA unknown


29-11-2021 08:00:48 Revision: 1
GRIJPSKE0000000000211129_001
Unplanned 29/11/2021 07:50 - 29/11/2021 16:50

Technical Capacity: 700,00 GWh/d Unavailable Capacity: 2975,00 GWh/d Available Capacity: 402,50 GWh/d

Due to technical problems

Due to technical problems


12-9-2021 22:05:20 Revision: 9

Inactive GRIJPSKE0000000000210911_009

Unplanned 11/09/2021 22:11 - 12/09/2021 22:00

Technical Capacity: 6,78 GWh/d Unavailable Capacity: 6,78 GWh/d Available Capacity: 0,00 GWh/d

High current module defect, and there is no spare on site.

Spare part on site and mounted....estimate 22:00 available


12-9-2021 20:20:38 Revision: 8
GRIJPSKE0000000000210911_008
Unplanned 11/09/2021 22:11 - 12/09/2021 22:00

Technical Capacity: 6,78 GWh/d Unavailable Capacity: 6,78 GWh/d Available Capacity: 0,00 GWh/d

High current module defect, and there is no spare on site.

Spare part on site and mounted....estimate 22:00 available


12-9-2021 20:19:24 Revision: 7
GRIJPSKE0000000000210911_007
Unplanned 11/09/2021 22:11 - 12/09/2021 22:00

Technical Capacity: 6,78 GWh/d Unavailable Capacity: 6,78 GWh/d Available Capacity: 0,00 GWh/d

High current module defect, and there is no spare on site.

Estimate 12-09 12:00 hr up and running


12-9-2021 11:44:14 Revision: 6
GRIJPSKE0000000000210911_006
Unplanned 11/09/2021 22:11 - 13/09/2021 13:00

Technical Capacity: 6,78 GWh/d Unavailable Capacity: 6,78 GWh/d Available Capacity: 0,00 GWh/d

High current module defect, and there is no spare on site.

Estimate 12-09 12:00 hr up and running


12-9-2021 09:56:21 Revision: 5
GRIJPSKE0000000000210911_005
Unplanned 11/09/2021 22:11 - 12/09/2021 12:00

Technical Capacity: 6,78 GWh/d Unavailable Capacity: 6,78 GWh/d Available Capacity: 0,00 GWh/d

Due to technical problems, vendor needs to visit

Estimate 12-09 12:00 hr up and running


12-9-2021 09:53:29 Revision: 4
GRIJPSKE0000000000210911_004
Unplanned 11/09/2021 22:11 - 12/09/2021 12:00

Technical Capacity: 6,78 GWh/d Unavailable Capacity: 6,78 GWh/d Available Capacity: 0,00 GWh/d

Due to technical problems, vendor needs to visit

Estimate 12-09 10:00 hr up and running


12-9-2021 00:31:52 Revision: 3
GRIJPSKE0000000000210911_003
Unplanned 11/09/2021 22:11 - 12/09/2021 10:00

Technical Capacity: 6,78 GWh/d Unavailable Capacity: 6,78 GWh/d Available Capacity: 0,00 GWh/d

Due to technical problems, vendor needs to visit

Estimate 12-09 10:00 hr up and running


11-9-2021 22:20:21 Revision: 2
GRIJPSKE0000000000210911_002
Unplanned 11/09/2021 22:11 - 12/09/2021 01:00

Technical Capacity: 6,78 GWh/d Unavailable Capacity: 6,78 GWh/d Available Capacity: 0,00 GWh/d

Due to technical problems

Estimate 12-09 1:00 hr up and running


11-9-2021 22:17:51 Revision: 1
GRIJPSKE0000000000210911_001
Unplanned 11/09/2021 22:11 - 12/09/2021 01:00

Technical Capacity: 678,00 GWh/d Unavailable Capacity: 678,00 GWh/d Available Capacity: 0,00 GWh/d

Due to technical problems

Estimate 12-09 1:00 hr up and running


24-7-2021 10:18:49 Revision: 3

Inactive NORG-NAM-0007482606210724_003

Unplanned 24/07/2021 05:02 - 24/07/2021 09:00

Technical Capacity: 395,76 GWh/d Unavailable Capacity: 255,36 GWh/d Available Capacity: 140,40 GWh/d

Due electrical problems in the 110 kv system two of the three compressors have tripped.

Checks have to be done. Probably ready for injection at 10:00 LET.


24-7-2021 07:31:10 Revision: 2
NORG-NAM-0007482606210724_002
Unplanned 24/07/2021 05:02 - 24/07/2021 09:00

Technical Capacity: 395,76 GWh/d Unavailable Capacity: 255,36 GWh/d Available Capacity: 140,40 GWh/d

Due electrical problems in the 110 kv system two of the three compressors have tripped.

Checks have to be done. Probably ready for injection at 10:00 LET.


24-7-2021 06:13:07 Revision: 1
NORG-NAM-0007482606210724_001
Unplanned 24/07/2021 05:02 - 24/07/2021 10:00

Technical Capacity: 395,76 GWh/d Unavailable Capacity: 255,36 GWh/d Available Capacity: 140,40 GWh/d

Due electrical problems in the 110 kv system two of the three compressors have tripped.

Checks have to be done. Probably ready for injection at 10:00 LET.


21-7-2021 17:10:24 Revision: 3

Inactive NORG-NAM-0007482609210721_003

Unplanned 21/07/2021 13:00 - 21/07/2021 16:00

Technical Capacity: 385,88 GWh/d Unavailable Capacity: 125,88 GWh/d Available Capacity: 260,00 GWh/d

Norg experienced a trip in a compression utility system, causing the compressors to stop.

Expected to be available for injection again at 17:00 LET.rnUPDATE : there are 2 compressors available at 16:00 LET


21-7-2021 14:02:18 Revision: 2
NORG-NAM-0007482609210721_002
Unplanned 21/07/2021 13:00 - 21/07/2021 16:00

Technical Capacity: 385,88 GWh/d Unavailable Capacity: 125,88 GWh/d Available Capacity: 260,00 GWh/d

Norg experienced a trip in a compression utility system, causing the compressors to stop.

Expected to be available for injection again at 17:00 LET.rnUPDATE : there are 2 compressors available at 16:00 LET


21-7-2021 12:29:07 Revision: 1
NORG-NAM-0007482609210721_001
Unplanned 21/07/2021 13:00 - 21/07/2021 17:00

Technical Capacity: 385,88 GWh/d Unavailable Capacity: 385,88 GWh/d Available Capacity: 0,00 GWh/d

Norg experienced a trip in a compression utility system, causing the compressors to stop.

Expected to be available for injection again at 17:00 LET.


20-7-2021 22:37:43 Revision: 3

Inactive NORG-NAM-0007482612210720_003

Unplanned 20/07/2021 19:00 - 20/07/2021 23:00

Technical Capacity: 385,88 GWh/d Unavailable Capacity: 385,88 GWh/d Available Capacity: 0,00 GWh/d

Norg experienced a trip in a compression utility system, causing the compressors to stop.

Expected to be available for injection again at 23:00 LET.


20-7-2021 18:48:19 Revision: 2
NORG-NAM-0007482612210720_002
Unplanned 20/07/2021 19:00 - 20/07/2021 22:00

Technical Capacity: 385,88 GWh/d Unavailable Capacity: 385,88 GWh/d Available Capacity: 0,00 GWh/d

Norg experienced a trip in a compression utility system, causing the compressors to stop.

Expected to be available for injection again at 22:00 LET.


20-7-2021 18:44:55 Revision: 1
NORG-NAM-0007482612210720_001
Unplanned 20/07/2021 19:00 - 20/07/2021 20:00

Technical Capacity: 385,88 GWh/d Unavailable Capacity: 385,88 GWh/d Available Capacity: 0,00 GWh/d

Norg experienced a trip in a compression utility system, causing the compressors to stop.

Expected to be available for injection again at 20:00 LET.


19-7-2021 16:06:41 Revision: 4

Inactive NORG-NAM-0007482616210718_004

Unplanned 18/07/2021 14:20 - 19/07/2021 16:00

Technical Capacity: 385,88 GWh/d Unavailable Capacity: 0,00 GWh/d Available Capacity: 385,88 GWh/d

Compressor unavailability

Event stop is unknown at the moment.rnUpdate: Problem solved. Compressor is ready for injection at 16:00 LET.


19-7-2021 15:55:37 Revision: 3
NORG-NAM-0007482616210718_003
Unplanned 18/07/2021 14:20 - 19/07/2021 16:00

Technical Capacity: 385,88 GWh/d Unavailable Capacity: 125,66 GWh/d Available Capacity: 260,22 GWh/d

Compressor unavailability

Event stop is unknown at the moment.rnUpdate: Problem solved. Compressor is ready for injection at 16:00 LET.


19-7-2021 14:57:45 Revision: 2
NORG-NAM-0007482616210718_002
Unplanned 18/07/2021 14:20 - 19/07/2021 14:20

Technical Capacity: 385,88 GWh/d Unavailable Capacity: 125,66 GWh/d Available Capacity: 260,22 GWh/d

Compressor unavailability

Event stop is unknown at the moment.rnUpdate: Problem solved. Compressor is ready for injection at 16:00 LET.


18-7-2021 14:25:38 Revision: 1
NORG-NAM-0007482616210718_001
Unplanned 18/07/2021 14:20 - 19/07/2021 14:20

Technical Capacity: 385,88 GWh/d Unavailable Capacity: 125,66 GWh/d Available Capacity: 260,22 GWh/d

Compressor unavailability

Event stop is unknown at the moment.


3-7-2021 19:25:53 Revision: 5

Inactive GRIJPSKE-0007482621210703_005

Unplanned 03/07/2021 04:00 - 03/07/2021 18:00

Technical Capacity: 162,70 GWh/d Unavailable Capacity: 162,70 GWh/d Available Capacity: 0,00 GWh/d

compressor unavailable due to technical problems

Problem solved


3-7-2021 17:56:11 Revision: 4
GRIJPSKE-0007482621210703_004
Unplanned 03/07/2021 04:00 - 03/07/2021 18:00

Technical Capacity: 162,70 GWh/d Unavailable Capacity: 162,70 GWh/d Available Capacity: 0,00 GWh/d

compressor unavailable due to technical problems

Problem solved


3-7-2021 17:22:44 Revision: 3
GRIJPSKE-0007482621210703_003
Unplanned 03/07/2021 04:00 - 03/07/2021 20:00

Technical Capacity: 162,70 GWh/d Unavailable Capacity: 162,70 GWh/d Available Capacity: 0,00 GWh/d

compressor unavailable due to technical problems

End time is an estimated time


3-7-2021 05:08:52 Revision: 2
GRIJPSKE-0007482621210703_002
Unplanned 03/07/2021 04:00 - 03/07/2021 18:00

Technical Capacity: 162,70 GWh/d Unavailable Capacity: 162,70 GWh/d Available Capacity: 0,00 GWh/d

compressor unavailable due to technical problems

End time is an estimated time


3-7-2021 03:14:45 Revision: 1
GRIJPSKE-0007482621210703_001
Unplanned 03/07/2021 04:00 - 03/07/2021 06:00

Technical Capacity: 162,70 GWh/d Unavailable Capacity: 162,70 GWh/d Available Capacity: 0,00 GWh/d

compressor unavailable due to technical problems

End time is an estimated time


2-7-2021 11:12:32 Revision: 2

Inactive NORG-NAM-0007482623210702_002

Unplanned 02/07/2021 05:40 - 02/07/2021 11:00

Technical Capacity: 356,20 GWh/d Unavailable Capacity: 219,40 GWh/d Available Capacity: 136,80 GWh/d

Two of the three compressors have trip by powerfail

Compressors are checked and up and running.


2-7-2021 05:38:52 Revision: 1
NORG-NAM-0007482623210702_001
Unplanned 02/07/2021 05:40 - 02/07/2021 12:00

Technical Capacity: 356,20 GWh/d Unavailable Capacity: 219,40 GWh/d Available Capacity: 136,80 GWh/d

Two of the three compressors have trip by powerfail

Compressors have to be checked by electrical engineer before the can start again.


29-6-2021 18:00:42 Revision: 3

Inactive NORG-NAM-0007482626210629_003

Unplanned 29/06/2021 15:00 - 29/06/2021 18:00

Technical Capacity: 356,20 GWh/d Unavailable Capacity: 356,20 GWh/d Available Capacity: 0,00 GWh/d

all the compressors have failed for unknow reasonrnrn

End time is an estimate, systems need a check and reset before startup.rnUpdate: Problem is solved and injection will start at 18:00.


29-6-2021 16:46:12 Revision: 2
NORG-NAM-0007482626210629_002
Unplanned 29/06/2021 15:00 - 29/06/2021 18:00

Technical Capacity: 356,20 GWh/d Unavailable Capacity: 356,20 GWh/d Available Capacity: 0,00 GWh/d

all the compressors have failed for unknow reasonrnrn

End time is an estimate, systems need a check and reset before startup.rnUpdate: Problem is solved and injection will start at 18:00.


29-6-2021 14:25:53 Revision: 1
NORG-NAM-0007482626210629_001
Unplanned 29/06/2021 15:00 - 29/06/2021 18:00

Technical Capacity: 356,20 GWh/d Unavailable Capacity: 356,20 GWh/d Available Capacity: 0,00 GWh/d

all the compressors have failed for unknow reasonrnrn

End time is an estimate, systems need a check and reset before startup.


28-6-2021 22:54:49 Revision: 3

Inactive NORG-NAM-0007482629210628_003

Unplanned 28/06/2021 12:00 - 28/06/2021 19:00

Technical Capacity: 356,20 GWh/d Unavailable Capacity: 92,60 GWh/d Available Capacity: 263,60 GWh/d

Due to the high outdoor temperature the cooling water temperature is to high. Therefor 1 compressor is down.rnrn

In the evening the temperature will be low enough to start the compressor. At 20:00hr the compressor is back on line.rnUpdate:at 19:00hr the compressor will be back on line.


28-6-2021 17:45:50 Revision: 2
NORG-NAM-0007482629210628_002
Unplanned 28/06/2021 12:00 - 28/06/2021 19:00

Technical Capacity: 356,20 GWh/d Unavailable Capacity: 92,60 GWh/d Available Capacity: 263,60 GWh/d

Due to the high outdoor temperature the cooling water temperature is to high. Therefor 1 compressor is down.rnrn

In the evening the temperature will be low enough to start the compressor. At 20:00hr the compressor is back on line.rnUpdate:at 19:00hr the compressor will be back on line.


28-6-2021 11:12:59 Revision: 1
NORG-NAM-0007482629210628_001
Unplanned 28/06/2021 12:00 - 28/06/2021 20:00

Technical Capacity: 356,20 GWh/d Unavailable Capacity: 92,60 GWh/d Available Capacity: 263,60 GWh/d

Due to the high outdoor temperature the cooling water temperature is to high. Therefor 1 compressor is down.rnrn

In the evening the temperature will be low enough to start the compressor. At 20:00hr the compressor is back on line.


17-6-2021 22:57:44 Revision: 8

Inactive NORG-NAM-0007482640210617_008

Unplanned 17/06/2021 10:00 - 18/06/2021 00:00

Technical Capacity: 395,78 GWh/d Unavailable Capacity: 100,58 GWh/d Available Capacity: 295,20 GWh/d

Due to the high outdoor temperature the cooling water temperature is to high and we had to stop all the compressors

At 21:00 LET the first compressor is ready to start with an injection capacity of 98,33 GWh/d. (4096 MWh/u).rnAt 23:00 LET the second compressor is ready to start with an injection capacity of 98,33 GWh/d. (4096 MWh/u)rnAt 00:00 LET the second compressor is ready to start with an injection capacity of 98,33 GWh/d. (4096 MWh/u)rnEnd time is an estimate.


17-6-2021 22:14:32 Revision: 7
NORG-NAM-0007482640210617_007
Unplanned 17/06/2021 10:00 - 18/06/2021 00:00

Technical Capacity: 395,78 GWh/d Unavailable Capacity: 100,58 GWh/d Available Capacity: 295,20 GWh/d

Due to the high outdoor temperature the cooling water temperature is to high and we had to stop all the compressors

At 21:00 LET the first compressor is ready to start with an injection capacity of 98,33 GWh/d. (4096 MWh/u).rnAt 23:00 LET the second compressor is ready to start with an injection capacity of 98,33 GWh/d. (4096 MWh/u)rnAt 00:00 LET the second compressor is ready to start with an injection capacity of 98,33 GWh/d. (4096 MWh/u)rnEnd time is an estimate.


17-6-2021 21:22:52 Revision: 6
NORG-NAM-0007482640210617_006
Unplanned 17/06/2021 10:00 - 18/06/2021 00:00

Technical Capacity: 395,78 GWh/d Unavailable Capacity: 198,91 GWh/d Available Capacity: 196,87 GWh/d

Due to the high outdoor temperature the cooling water temperature is to high and we had to stop all the compressors

At 21:00 LET the first compressor is ready to start with an injection capacity of 98,33 GWh/d. (4096 MWh/u).rnAt 23:00 LET the second compressor is ready to start with an injection capacity of 98,33 GWh/d. (4096 MWh/u)rnEnd time is an estimate.


17-6-2021 17:52:24 Revision: 5
NORG-NAM-0007482640210617_005
Unplanned 17/06/2021 10:00 - 18/06/2021 00:00

Technical Capacity: 395,78 GWh/d Unavailable Capacity: 297,45 GWh/d Available Capacity: 98,33 GWh/d

Due to the high outdoor temperature the cooling water temperature is to high and we had to stop all the compressors

At 21:00 LET the first compressor is ready to start with a injection capacity of 98,33 GWh/d. (4096 MWh/u). The other two compressors still have to cool down. End time is an estimate.


17-6-2021 14:27:58 Revision: 4
NORG-NAM-0007482640210617_004
Unplanned 17/06/2021 10:00 - 17/06/2021 20:00

Technical Capacity: 395,78 GWh/d Unavailable Capacity: 395,78 GWh/d Available Capacity: 0,00 GWh/d

Due to the high outdoor temperature the cooling water temperature is to high and we had to stop all the compressors

End time is an estimate


17-6-2021 11:42:56 Revision: 3
NORG-NAM-0007482640210617_003
Unplanned 17/06/2021 10:00 - 17/06/2021 20:00

Technical Capacity: 395,78 GWh/d Unavailable Capacity: 179,78 GWh/d Available Capacity: 216,00 GWh/d

Due to the high outdoor temperature the cooling water temperature is to high and we had to stop one of the compressors

End time is an estimate


17-6-2021 11:05:59 Revision: 2
NORG-NAM-0007482640210617_002
Unplanned 17/06/2021 10:00 - 17/06/2021 20:00

Technical Capacity: 395,78 GWh/d Unavailable Capacity: 150,26 GWh/d Available Capacity: 245,52 GWh/d

Due to the high outdoor temperature the cooling water temperature is to high

End time is an estimate


17-6-2021 10:00:40 Revision: 1
NORG-NAM-0007482640210617_001
Unplanned 17/06/2021 10:00 - 17/06/2021 20:00

Technical Capacity: 395,78 GWh/d Unavailable Capacity: 111,14 GWh/d Available Capacity: 284,64 GWh/d

Due to the high outdoor temperature the cooling water temperature is to high

End time is an estimate


17-6-2021 21:05:48 Revision: 3

Inactive GRIJPSKE-0007482636210617_003

Unplanned 17/06/2021 15:00 - 17/06/2021 21:00

Technical Capacity: 350,13 GWh/d Unavailable Capacity: 0,00 GWh/d Available Capacity: 350,13 GWh/d

Due to the high outdoor temperature the cooling water temperature is to high and we have to stop the compressor.

GRK-UGS will start at 21:00 LET with 4218MWh/h


17-6-2021 18:02:30 Revision: 2
GRIJPSKE-0007482636210617_002
Unplanned 17/06/2021 15:00 - 17/06/2021 21:00

Technical Capacity: 350,13 GWh/d Unavailable Capacity: 0,00 GWh/d Available Capacity: 350,13 GWh/d

Due to the high outdoor temperature the cooling water temperature is to high and we have to stop the compressor.

GRK-UGS will start at 21:00 LET with 4218MWh/h


17-6-2021 14:35:08 Revision: 1
GRIJPSKE-0007482636210617_001
Unplanned 17/06/2021 15:00 - 17/06/2021 20:00

Technical Capacity: 350,13 GWh/d Unavailable Capacity: 0,00 GWh/d Available Capacity: 350,13 GWh/d

Due to the high outdoor temperature the cooling water temperature is to high and we have to stop the compressor

End time is an estimate time


1-6-2021 15:59:04 Revision: 7

Inactive NORG-NAM-0007482647210601_007

Unplanned 01/06/2021 08:50 - 01/06/2021 17:00

Technical Capacity: 435,30 GWh/d Unavailable Capacity: 290,20 GWh/d Available Capacity: 145,10 GWh/d

Deferment due to technical issues on two compressors.

Compressor outage first compressor due to instrumental problem. A problem on the third compressor still persist. Therefore third compressor still under repair. Problem solved.


1-6-2021 14:15:45 Revision: 6
NORG-NAM-0007482647210601_006
Unplanned 01/06/2021 08:50 - 01/06/2021 23:59

Technical Capacity: 435,30 GWh/d Unavailable Capacity: 290,20 GWh/d Available Capacity: 145,10 GWh/d

Deferment due to technical issues on two compressors.

Compressor outage first compressor due to instrumental problem. A problem on the third compressor still persist. Therefore third compressor still under repair.


1-6-2021 13:22:48 Revision: 5
NORG-NAM-0007482647210601_005
Unplanned 01/06/2021 08:50 - 01/06/2021 16:00

Technical Capacity: 435,30 GWh/d Unavailable Capacity: 290,20 GWh/d Available Capacity: 145,10 GWh/d

Deferment due to technical issues on two compressors.

Compressor outage first compressor due to instrumental problem. A problem on the third compressor still persist. Therefore third compressor still under repair.


1-6-2021 12:23:51 Revision: 4
NORG-NAM-0007482647210601_004
Unplanned 01/06/2021 08:50 - 01/06/2021 18:00

Technical Capacity: 435,30 GWh/d Unavailable Capacity: 145,10 GWh/d Available Capacity: 290,20 GWh/d

Deferment due to technical issues on two compressors.

Technical problems with recycle valve is solved. One compressor is reinstalled and on duty. An additional problem still persist. Therefore third compressor still under repair.


1-6-2021 11:28:14 Revision: 3
NORG-NAM-0007482647210601_003
Unplanned 01/06/2021 08:50 - 01/06/2021 13:00

Technical Capacity: 435,30 GWh/d Unavailable Capacity: 290,20 GWh/d Available Capacity: 145,10 GWh/d

Deferment due to technical issues on two compressors.

Technical problems with recycle valve needs to be solved.rnDuration of the repair had to be extended to 13:00 due to the complexity of the problem.


1-6-2021 10:47:40 Revision: 2
NORG-NAM-0007482647210601_002
Unplanned 01/06/2021 08:50 - 01/06/2021 12:00

Technical Capacity: 435,30 GWh/d Unavailable Capacity: 290,20 GWh/d Available Capacity: 145,10 GWh/d

Deferment due to technical issues on two compressors.

Technical problems with recycle valve needs to be solved.rnDuration of the repair had to be extended to 12:00 due to the complexity of the problem.


1-6-2021 09:02:03 Revision: 1
NORG-NAM-0007482647210601_001
Unplanned 01/06/2021 08:50 - 01/06/2021 10:50

Technical Capacity: 435,30 GWh/d Unavailable Capacity: 290,20 GWh/d Available Capacity: 145,10 GWh/d

Deferment due to technical issues on two compressors.

Technical problems with recycle valve needs to be solved.


2-5-2021 05:06:58 Revision: 6

Inactive GRIJPSKE-0007482642210430_006

Unplanned 30/04/2021 22:02 - 02/05/2021 14:00

Technical Capacity: 168,00 GWh/d Unavailable Capacity: 168,00 GWh/d Available Capacity: 0,00 GWh/d

Integrity issue with the discharge header injection compressor.

Problems concerning anti surge control still persist. Help to solve problem has been scaled up. REMIT extended to 2nd of May, 14:00hr LET.


2-5-2021 03:26:54 Revision: 5
GRIJPSKE-0007482642210430_005
Unplanned 30/04/2021 22:02 - 02/05/2021 14:00

Technical Capacity: 168,00 GWh/d Unavailable Capacity: 168,00 GWh/d Available Capacity: 0,00 GWh/d

Integrity issue with the discharge header injection compressor.

Problems concerning anti surge control still persist. Help to solve problem has been scaled up. REMIT extended to 2nd of May, 14:00hr LET.


2-5-2021 01:53:32 Revision: 4
GRIJPSKE-0007482642210430_004
Unplanned 30/04/2021 22:02 - 02/05/2021 04:00

Technical Capacity: 168,00 GWh/d Unavailable Capacity: 168,00 GWh/d Available Capacity: 0,00 GWh/d

Integrity issue with the discharge header injection compressor.

Compressor has problems with anti surge control, REMIT extended to 2nd of May 4.00h


1-5-2021 22:45:52 Revision: 3
GRIJPSKE-0007482642210430_003
Unplanned 30/04/2021 22:02 - 02/05/2021 02:00

Technical Capacity: 168,00 GWh/d Unavailable Capacity: 168,00 GWh/d Available Capacity: 0,00 GWh/d

Integrity issue with the discharge header injection compressor.

Compressor has problems with anti surge control, REMIT extended to 2nd of May 2.00h


1-5-2021 15:54:21 Revision: 2
GRIJPSKE-0007482642210430_002
Unplanned 30/04/2021 22:02 - 01/05/2021 22:00

Technical Capacity: 168,00 GWh/d Unavailable Capacity: 168,00 GWh/d Available Capacity: 0,00 GWh/d

Integrity issue with the discharge header injection compressor.

Repair will take more time; REMIT extended to 22.00h


30-4-2021 22:11:55 Revision: 1
GRIJPSKE-0007482642210430_001
Unplanned 30/04/2021 22:02 - 01/05/2021 18:00

Technical Capacity: 168,00 GWh/d Unavailable Capacity: 168,00 GWh/d Available Capacity: 0,00 GWh/d

Integrity issue with the discharge header injection compressor.

Expected to be fixed 1st of May u002721 18:00h.


24-4-2021 12:38:04 Revision: 5

Inactive GRIJPSKE-0007482647210422_005

Unplanned 22/04/2021 11:45 - 24/04/2021 12:00

Technical Capacity: 539,00 GWh/d Unavailable Capacity: 539,00 GWh/d Available Capacity: 0,00 GWh/d

Due to technical issues

Uncertain when prod will be availablernExpected end time is updated :23/04/2021 13:00hrnNew expected end time is updated :24/04/2021 12:00 hr


23-4-2021 18:14:00 Revision: 4
GRIJPSKE-0007482647210422_004
Unplanned 22/04/2021 11:45 - 24/04/2021 12:00

Technical Capacity: 539,00 GWh/d Unavailable Capacity: 539,00 GWh/d Available Capacity: 0,00 GWh/d

Due to technical issues

Uncertain when prod will be availablernExpected end time is updated :23/04/2021 13:00hrnNew expected end time is updated :24/04/2021 12:00 hr


23-4-2021 12:36:15 Revision: 3
GRIJPSKE-0007482647210422_003
Unplanned 22/04/2021 11:45 - 26/04/2021 06:00

Technical Capacity: 539,00 GWh/d Unavailable Capacity: 539,00 GWh/d Available Capacity: 0,00 GWh/d

Due to technical issues

Uncertain when prod will be availablernExpected end time is updated :23/04/2021 13:00hrnNew expected end time is updated :26/04/2021 06:00h


22-4-2021 16:36:31 Revision: 2
GRIJPSKE-0007482647210422_002
Unplanned 22/04/2021 11:45 - 23/04/2021 13:00

Technical Capacity: 539,00 GWh/d Unavailable Capacity: 539,00 GWh/d Available Capacity: 0,00 GWh/d

Due to technical issues

Uncertain when prod will be availablernExpected end time is updated :23/04/2021 13:00h


22-4-2021 11:43:59 Revision: 1
GRIJPSKE-0007482647210422_001
Unplanned 22/04/2021 11:45 - 22/04/2021 17:45

Technical Capacity: 539,00 GWh/d Unavailable Capacity: 539,00 GWh/d Available Capacity: 0,00 GWh/d

Due to technical issues

Uncertain when prod will be available


16-2-2021 16:41:13 Revision: 2

Inactive GRIJPSKE-0007482647210216_002

Unplanned 16/02/2021 14:00 - 16/02/2021 16:40

Technical Capacity: 504,00 GWh/d Unavailable Capacity: 240,00 GWh/d Available Capacity: 264,00 GWh/d

Technical issues

uncertain when technical problems are solved.


16-2-2021 13:43:38 Revision: 1
GRIJPSKE-0007482647210216_001
Unplanned 16/02/2021 14:00 - 17/02/2021 06:00

Technical Capacity: 504,00 GWh/d Unavailable Capacity: 240,00 GWh/d Available Capacity: 264,00 GWh/d

Technical issues

uncertain when technical problems are solved.


12-1-2021 17:34:55 Revision: 2

Inactive NORG-NAM-0007482647210111_002

Unplanned 11/01/2021 17:00 - 12/01/2021 18:00

Technical Capacity: 32,53 GWh/d Unavailable Capacity: 16,04 GWh/d Available Capacity: 16,49 GWh/d

Due to technical intergrity

Issue regarding technical integrity has been resolved.


11-1-2021 16:41:46 Revision: 1
NORG-NAM-0007482647210111_001
Unplanned 11/01/2021 17:00 - 15/01/2021 16:00

Technical Capacity: 32,53 GWh/d Unavailable Capacity: 16,04 GWh/d Available Capacity: 16,49 GWh/d

Due to technical intergrity

In the most positive sense, we think it will be resolved by the end of the week.


22-9-2020 15:58:31 Revision: 3

Inactive GRIJPSKE-0007482647200922_003

Unplanned 22/09/2020 10:00 - 22/09/2020 16:00

Technical Capacity: 134,67 GWh/d Unavailable Capacity: 0,00 GWh/d Available Capacity: 134,67 GWh/d

compressor unavailable due to technical problems

The compressor is available at 16:00 LET


22-9-2020 13:33:29 Revision: 2
GRIJPSKE-0007482647200922_002
Unplanned 22/09/2020 10:00 - 22/09/2020 16:00

Technical Capacity: 134,67 GWh/d Unavailable Capacity: 0,00 GWh/d Available Capacity: 134,67 GWh/d

compressor unavailable due to technical problems

The compressor is available at 16:00 LET


22-9-2020 09:42:34 Revision: 1
GRIJPSKE-0007482647200922_001
Unplanned 22/09/2020 10:00 - 25/09/2020 18:00

Technical Capacity: 134,67 GWh/d Unavailable Capacity: 134,67 GWh/d Available Capacity: 0,00 GWh/d

compressor unavailable due to technical problems

compressor unavailable due to technical problems


11-9-2020 19:26:13 Revision: 2

Inactive NORG-NAM-0007482647200911_002

Unplanned 10/09/2020 22:15 - 11/09/2020 23:00

Technical Capacity: 358,50 GWh/d Unavailable Capacity: 0,00 GWh/d Available Capacity: 358,50 GWh/d

One compressor unavailable due to technical problems

The problems are solved


11-9-2020 12:12:53 Revision: 1
NORG-NAM-0007482647200911_001
Unplanned 10/09/2020 22:15 - 12/09/2020 23:00

Technical Capacity: 358,50 GWh/d Unavailable Capacity: 98,78 GWh/d Available Capacity: 259,72 GWh/d

One compressor unavailable due to technical problems

uncertain when technical problems are solved.


21-8-2020 21:50:19 Revision: 3

Inactive NORG-NAM-0007482632200821_003

Unplanned 21/08/2020 17:00 - 21/08/2020 22:00

Technical Capacity: 348,54 GWh/d Unavailable Capacity: 0,00 GWh/d Available Capacity: 348,54 GWh/d

The outdoor temperature has dropped enough to start the 3nd compressor again rnrnrn

Outdoor temperature has dropped enough to start up third compressorrn


21-8-2020 21:39:54 Revision: 2
NORG-NAM-0007482632200821_002
Unplanned 21/08/2020 17:00 - 21/08/2020 22:00

Technical Capacity: 348,54 GWh/d Unavailable Capacity: 0,00 GWh/d Available Capacity: 348,54 GWh/d

The outdoor temperature has dropped enough to start the 3nd compressor again rnrnrn

Outdoor temperature has dropped enough to start up third compressorrn


21-8-2020 14:39:15 Revision: 1
NORG-NAM-0007482632200821_001
Unplanned 21/08/2020 17:00 - 22/08/2020 00:00

Technical Capacity: 348,54 GWh/d Unavailable Capacity: 89,63 GWh/d Available Capacity: 258,91 GWh/d

Due to the high outdoor temperature the cooling water temperature is to high. Therefor 1 compressor is down.

When high outdoor temperatures will be low enough to start the compressor.


17-8-2020 03:13:23 Revision: 13

Inactive NORG-NAM-0007482645200807_013

Unplanned 07/08/2020 12:07 - 17/08/2020 06:00

Technical Capacity: 316,47 GWh/d Unavailable Capacity: 0,00 GWh/d Available Capacity: 316,47 GWh/d

The outdoor temperature has dropped enough to start the 3nd compressor again rn

Outdoor temperature has dropped enough to start up third compressor


12-8-2020 21:51:59 Revision: 12
NORG-NAM-0007482645200807_012
Unplanned 07/08/2020 12:07 - 14/08/2020 12:07

Technical Capacity: 316,47 GWh/d Unavailable Capacity: 98,78 GWh/d Available Capacity: 217,69 GWh/d

The outdoor temperature has dropped enough to start the 2nd compressor again rn

Outdoor temperature has dropped enough to start up second compressor.


12-8-2020 14:47:43 Revision: 11
NORG-NAM-0007482645200807_011
Unplanned 07/08/2020 12:07 - 14/08/2020 12:07

Technical Capacity: 316,47 GWh/d Unavailable Capacity: 222,36 GWh/d Available Capacity: 94,11 GWh/d

Due to the high outdoor temperature the cooling water temperature is to high. Therfor 2 compressors are down. rnrnrn

When high outdoor temperatures will be low enough. The compressor will be started


12-8-2020 12:12:55 Revision: 10
NORG-NAM-0007482645200807_010
Unplanned 07/08/2020 12:07 - 13/08/2020 12:07

Technical Capacity: 316,47 GWh/d Unavailable Capacity: 207,75 GWh/d Available Capacity: 108,72 GWh/d

Due to the high outdoor temperature the cooling water temperature is to high. Therfor 2 compressors are downrnrnrn

When high outdoor temperatures will be low enough. The compressor will be started


11-8-2020 22:07:51 Revision: 9
NORG-NAM-0007482645200807_009
Unplanned 07/08/2020 12:07 - 12/08/2020 12:07

Technical Capacity: 316,47 GWh/d Unavailable Capacity: 98,78 GWh/d Available Capacity: 217,69 GWh/d

The outdoor temperature has dropped enough to start the 2nd compressor again rnrnrn

Outdoor temperature has dropped enough to start up second compressor.


11-8-2020 12:06:24 Revision: 8
NORG-NAM-0007482645200807_008
Unplanned 07/08/2020 12:07 - 12/08/2020 12:07

Technical Capacity: 316,47 GWh/d Unavailable Capacity: 182,79 GWh/d Available Capacity: 133,68 GWh/d

Due to the high outdoor temperature the cooling water temperature is to high. Therefor 2 compressors are downrnrnrn

When high outdoor temperatures will be low enough to start the compressor


10-8-2020 22:01:21 Revision: 7
NORG-NAM-0007482645200807_007
Unplanned 07/08/2020 12:07 - 12/08/2020 12:07

Technical Capacity: 316,47 GWh/d Unavailable Capacity: 98,78 GWh/d Available Capacity: 217,69 GWh/d

The outdoor temperature has dropped enough to start the 2nd compressor againrnrnrn

Outdoor temperature has dropped enough to start up second compressor.


10-8-2020 14:57:12 Revision: 6
NORG-NAM-0007482645200807_006
Unplanned 07/08/2020 12:07 - 12/08/2020 12:07

Technical Capacity: 316,47 GWh/d Unavailable Capacity: 182,79 GWh/d Available Capacity: 133,68 GWh/d

Due to the high outdoor temperature the cooling water temperature is to high. Therefor 2 compressors are downrnrnrn

When high outdoor temperatures will be low enough to start the compressor


9-8-2020 00:14:25 Revision: 5
NORG-NAM-0007482645200807_005
Unplanned 07/08/2020 12:07 - 12/08/2020 12:07

Technical Capacity: 316,47 GWh/d Unavailable Capacity: 98,78 GWh/d Available Capacity: 217,69 GWh/d

The outdoor temperature has dropped enough to start the 2nd compressor againrnrnrn

At midnight we started the second compressor again


8-8-2020 12:14:11 Revision: 4
NORG-NAM-0007482645200807_004
Unplanned 07/08/2020 12:07 - 12/08/2020 12:07

Technical Capacity: 316,47 GWh/d Unavailable Capacity: 182,79 GWh/d Available Capacity: 133,68 GWh/d

Due to the high outdoor temperature the cooling water temperature is to high. Therefor 2 compressors are down.rnrnrn

When high outdoor temperatures will be low enough to start the compressor.


8-8-2020 01:26:31 Revision: 3
NORG-NAM-0007482645200807_003
Unplanned 07/08/2020 12:07 - 12/08/2020 12:07

Technical Capacity: 316,47 GWh/d Unavailable Capacity: 98,78 GWh/d Available Capacity: 217,69 GWh/d

Due to the high outdoor temperature the cooling water temperature is to high. rnTemperature has dropped, 1 compressor started up again. So from now on, two of the three compressors are running

Outdoor temperature has dropped enough to start up second compressor.


7-8-2020 18:28:58 Revision: 2
NORG-NAM-0007482645200807_002
Unplanned 07/08/2020 12:07 - 12/08/2020 12:07

Technical Capacity: 316,47 GWh/d Unavailable Capacity: 182,79 GWh/d Available Capacity: 133,68 GWh/d

Due to the high outdoor temperature the cooling water temperature is to high. Therefor 2 compressors are down.

When high outdoor temperatures will be low enough to start the compressor.


7-8-2020 12:15:17 Revision: 1
NORG-NAM-0007482645200807_001
Unplanned 07/08/2020 12:07 - 12/08/2020 12:07

Technical Capacity: 316,47 GWh/d Unavailable Capacity: 98,78 GWh/d Available Capacity: 217,69 GWh/d

Due to the high outdoor temperature the cooling water temperature is to high. Therefor 1 compressor is down.

When high outdoor temperatures will be low enough to start the compressor.


31-7-2020 21:08:16 Revision: 2

Inactive NORG-NAM-0007482647200731_002

Unplanned 31/07/2020 17:30 - 31/07/2020 22:00

Technical Capacity: 316,47 GWh/d Unavailable Capacity: 98,78 GWh/d Available Capacity: 217,69 GWh/d

Due to the high outdoor temperature the cooling water temperature is to high. Therefor 1 compressor is down.

At midnight the temperature will be low enough to start the compressor. At 22:00hr the compressor is back on line.


31-7-2020 17:44:36 Revision: 1
NORG-NAM-0007482647200731_001
Unplanned 31/07/2020 17:30 - 01/08/2020 01:00

Technical Capacity: 316,47 GWh/d Unavailable Capacity: 98,78 GWh/d Available Capacity: 217,69 GWh/d

Due to the high outdoor temperature the cooling water temperature is to high. Therefor 1 compressor is down.

At midnight the temperature will be low enough to start the compressor.


14-6-2020 08:46:10 Revision: 2

Inactive NORG-NAM-0007482647200614_002

Unplanned 14/06/2020 05:13 - 14/06/2020 07:00

Technical Capacity: 12,00 GWh/d Unavailable Capacity: 6,00 GWh/d Available Capacity: 6,00 GWh/d

External powerfailure

100% capacity expected at 07:00 LETrnAt 07:45 LET 100% capacity back after reset.


14-6-2020 05:16:40 Revision: 1
NORG-NAM-0007482647200614_001
Unplanned 14/06/2020 05:13 - 14/06/2020 07:00

Technical Capacity: 12,00 GWh/d Unavailable Capacity: 6,00 GWh/d Available Capacity: 6,00 GWh/d

External powerfailure

100% capacity expected at 07:00 LET


5-3-2020 05:17:26 Revision: 2

Inactive GRIJPSKE-0007482647200227_002

Unplanned 27/02/2020 14:00 - 04/03/2020 06:00

Technical Capacity: 134,66 GWh/d Unavailable Capacity: 134,66 GWh/d Available Capacity: 0,00 GWh/d

CCC controler of the compressor K-4101 is defect. rnControler has been repared.

Expected that compressor will be available at wednesday 4th March.


27-2-2020 14:25:27 Revision: 1
GRIJPSKE-0007482647200227_001
Unplanned 27/02/2020 14:00 - 04/03/2020 06:00

Technical Capacity: 134,66 GWh/d Unavailable Capacity: 134,66 GWh/d Available Capacity: 0,00 GWh/d

CCC controler of the compressor K-4101 is defect.

Expected that compressor will be available at wednesday 4th March.


11-8-2019 04:02:48 Revision: 2

Inactive GRIJPSKE-0007482647190811_002

Unplanned 11/08/2019 00:15 - 11/08/2019 04:00

Technical Capacity: 128,00 GWh/d Unavailable Capacity: 128,00 GWh/d Available Capacity: 0,00 GWh/d

compressor has failed for unknow reason

Event stop time is an estimate, installations to be checked and a reset to be performed.


11-8-2019 00:37:33 Revision: 1
GRIJPSKE-0007482647190811_001
Unplanned 11/08/2019 00:15 - 11/08/2019 04:00

Technical Capacity: 128,00 GWh/d Unavailable Capacity: 128,00 GWh/d Available Capacity: 0,00 GWh/d

compressor has failed for unknow reason

Event stop time is an estimate, installations to be checked and a reset to be performed.


5-7-2019 19:19:54 Revision: 4

Inactive GRIJPSKE-0007482647190705_004

Unplanned 05/07/2019 14:00 - 05/07/2019 20:00

Technical Capacity: 148,13 GWh/d Unavailable Capacity: 148,13 GWh/d Available Capacity: 0,00 GWh/d

compressor has failed for unknow reason

End time is an estimate, systems need a check and reset before startup. Communication card compressor control changed out


5-7-2019 19:10:12 Revision: 3
GRIJPSKE-0007482647190705_003
Unplanned 05/07/2019 14:00 - 05/07/2019 20:00

Technical Capacity: 148,13 GWh/d Unavailable Capacity: 148,13 GWh/d Available Capacity: 0,00 GWh/d

compressor has failed for unknow reason

End time is an estimate, systems need a check and reset before startup. Communication card compressor control changed out


5-7-2019 17:40:16 Revision: 2
GRIJPSKE-0007482647190705_002
Unplanned 05/07/2019 14:00 - 05/07/2019 21:00

Technical Capacity: 148,13 GWh/d Unavailable Capacity: 148,13 GWh/d Available Capacity: 0,00 GWh/d

compressor has failed for unknow reason

End time is an estimate, systems need a check and reset before startup.


5-7-2019 13:38:10 Revision: 1
GRIJPSKE-0007482647190705_001
Unplanned 05/07/2019 14:00 - 05/07/2019 18:00

Technical Capacity: 148,13 GWh/d Unavailable Capacity: 148,13 GWh/d Available Capacity: 0,00 GWh/d

compressor has failed for unknow reason

End time is an estimate, systems need a check and reset before startup. Compressor is running again


25-6-2019 22:34:52 Revision: 3

Inactive GRIJPSKE-0007482644190625_003

Unplanned 25/06/2019 11:57 - 25/06/2019 23:00

Technical Capacity: 148,13 GWh/d Unavailable Capacity: 148,13 GWh/d Available Capacity: 0,00 GWh/d

compressor has failed for unknow reason

End time is an estimate, systems need a check and reset before startup. Compressor is running again. rnCompressor will produce at 23:00


25-6-2019 19:49:58 Revision: 2
GRIJPSKE-0007482644190625_002
Unplanned 25/06/2019 11:57 - 25/06/2019 23:00

Technical Capacity: 148,13 GWh/d Unavailable Capacity: 148,13 GWh/d Available Capacity: 0,00 GWh/d

compressor has failed for unknow reason

End time is an estimate, systems need a check and reset before startup. Compressor is running again


25-6-2019 11:56:47 Revision: 1
GRIJPSKE-0007482644190625_001
Unplanned 25/06/2019 11:57 - 25/06/2019 22:00

Technical Capacity: 148,13 GWh/d Unavailable Capacity: 148,13 GWh/d Available Capacity: 0,00 GWh/d

compressor has failed for unknow reason

End time is an estimate, systems need a check and reset before startup. Compressor is running again


18-6-2019 19:10:08 Revision: 3

Inactive GRIJPSKE-0007482647190618_003

Unplanned 18/06/2019 17:00 - 18/06/2019 20:00

Technical Capacity: 148,13 GWh/d Unavailable Capacity: 148,13 GWh/d Available Capacity: 0,00 GWh/d

compressor has failed for unknow reason

End time is an estimate, systems need a check and reset before startup. Compressor is running again


18-6-2019 19:09:35 Revision: 2
GRIJPSKE-0007482647190618_002
Unplanned 18/06/2019 17:00 - 18/06/2019 20:00

Technical Capacity: 148,13 GWh/d Unavailable Capacity: 148,13 GWh/d Available Capacity: 0,00 GWh/d

compressor has failed for unknow reason

End time is an estimate, systems need a check and reset before startup. Compressor is running again


18-6-2019 17:09:39 Revision: 1
GRIJPSKE-0007482647190618_001
Unplanned 18/06/2019 17:00 - 18/06/2019 21:00

Technical Capacity: 148,13 GWh/d Unavailable Capacity: 148,13 GWh/d Available Capacity: 0,00 GWh/d

compressor has failed for unknow reason

End time is an estimate, systems need a check and reset before startup


2-6-2019 20:56:11 Revision: 2

Inactive GRIJPSKE-0007482640190602_002

Unplanned 02/06/2019 15:27 - 02/06/2019 21:00

Technical Capacity: 150,38 GWh/d Unavailable Capacity: 150,38 GWh/d Available Capacity: 0,00 GWh/d

Compressor problem

Event stop time is an estimate, installations to be checked and a reset to be performed.rnCompressor is running again.


2-6-2019 15:35:16 Revision: 1
GRIJPSKE-0007482640190602_001
Unplanned 02/06/2019 15:27 - 02/06/2019 21:00

Technical Capacity: 150,38 GWh/d Unavailable Capacity: 150,38 GWh/d Available Capacity: 0,00 GWh/d

Compressor problem

Event stop time is an estimate, installations to be checked and a reset to be performed.


8-5-2019 05:36:34 Revision: 4

Inactive GRIJPSKE-0007482647190507_004

Unplanned 07/05/2019 17:25 - 07/05/2019 23:00

Technical Capacity: 150,00 GWh/d Unavailable Capacity: 150,00 GWh/d Available Capacity: 0,00 GWh/d

A short event in the power grid (power supply) caused a trip of the compressor units

Event stop time is an estimate, installations to be checked and a reset to be performed.


7-5-2019 19:54:37 Revision: 3
GRIJPSKE-0007482647190507_003
Unplanned 07/05/2019 17:25 - 07/05/2019 23:00

Technical Capacity: 150,00 GWh/d Unavailable Capacity: 150,00 GWh/d Available Capacity: 0,00 GWh/d

A short event in the power grid (power supply) caused a trip of the compressor units

Event stop time is an estimate, installations to be checked and a reset to be performed.


7-5-2019 18:03:07 Revision: 2
GRIJPSKE-0007482647190507_002
Unplanned 07/05/2019 17:25 - 07/05/2019 20:00

Technical Capacity: 150,00 GWh/d Unavailable Capacity: 150,00 GWh/d Available Capacity: 0,00 GWh/d

A short event in the power grid (power supply) caused a trip of the compressor units

Event stop time is an estimate, installations to be checked and a reset to be performed.


7-5-2019 17:58:23 Revision: 1
GRIJPSKE-0007482647190507_001
Unplanned 07/05/2019 17:25 - 07/05/2019 20:00

Technical Capacity: 350,00 GWh/d Unavailable Capacity: 350,00 GWh/d Available Capacity: 0,00 GWh/d

A short event in the power grid (power supply) caused a trip of the compressor units

Event stop time is an estimate, installations to be checked and a reset to be performed.


8-5-2019 05:35:26 Revision: 3

Inactive GRONINGE-0007482646190507_003

Unplanned 07/05/2019 17:25 - 07/05/2019 21:00

Technical Capacity: 945000000,00 KWh/d Unavailable Capacity: 30000000,00 KWh/d Available Capacity: 915000000,00 KWh/d

A short event in the power grid (power supply) caused a trip of the compressor units

End time is an estimate, systems need a check and reset before startup


7-5-2019 19:58:40 Revision: 2
GRONINGE-0007482646190507_002
Unplanned 07/05/2019 17:25 - 07/05/2019 21:00

Technical Capacity: 945000000,00 KWh/d Unavailable Capacity: 30000000,00 KWh/d Available Capacity: 915000000,00 KWh/d

A short event in the power grid (power supply) caused a trip of the compressor units

End time is an estimate, systems need a check and reset before startup


7-5-2019 18:02:22 Revision: 1
GRONINGE-0007482646190507_001
Unplanned 07/05/2019 17:25 - 07/05/2019 20:00

Technical Capacity: 945000000,00 KWh/d Unavailable Capacity: 555000000,00 KWh/d Available Capacity: 390000000,00 KWh/d

A short event in the power grid (power supply) caused a trip of the compressor units

End time is an estimate, systems need a check and reset before startup


2-3-2019 18:37:10 Revision: 4

Inactive GRIJPSKE-0007482647190302_004

Unplanned 02/03/2019 09:00 - 02/03/2019 18:00

Technical Capacity: 134,67 GWh/d Unavailable Capacity: 134,67 GWh/d Available Capacity: 0,00 GWh/d

compressor has failed for unknow reason

Problem solved.


2-3-2019 17:50:19 Revision: 3
GRIJPSKE-0007482647190302_003
Unplanned 02/03/2019 09:00 - 02/03/2019 18:00

Technical Capacity: 134,67 GWh/d Unavailable Capacity: 134,67 GWh/d Available Capacity: 0,00 GWh/d

compressor has failed for unknow reason

investigation


2-3-2019 15:31:08 Revision: 2
GRIJPSKE-0007482647190302_002
Unplanned 02/03/2019 09:00 - 03/03/2019 16:00

Technical Capacity: 134,67 GWh/d Unavailable Capacity: 134,67 GWh/d Available Capacity: 0,00 GWh/d

compressor has failed for unknow reason

investigation


2-3-2019 08:55:56 Revision: 1
GRIJPSKE-0007482647190302_001
Unplanned 02/03/2019 09:00 - 02/03/2019 16:00

Technical Capacity: 134,67 GWh/d Unavailable Capacity: 134,67 GWh/d Available Capacity: 0,00 GWh/d

compressor has failed for unknow reason

investigation


23-2-2019 10:41:43 Revision: 2

Inactive NORG-NAM-0007482647190222_002

Unplanned 22/02/2019 16:15 - 23/02/2019 10:40

Technical Capacity: 703,83 GWh/d Unavailable Capacity: 216,51 GWh/d Available Capacity: 487,32 GWh/d

Unavailable due to technical integrity on de Norgron pipeline.

Problem is solved


22-2-2019 17:29:07 Revision: 1
NORG-NAM-0007482647190222_001
Unplanned 22/02/2019 16:15 - 26/02/2019 22:55

Technical Capacity: 703,83 GWh/d Unavailable Capacity: 216,51 GWh/d Available Capacity: 487,32 GWh/d

Unavailable due to technical integrity on de Norgron pipeline.

Most likely the problem will be solved by monday 25-02-2019


15-2-2019 10:40:36 Revision: 2

Inactive GRIJPSKE-0007482647190215_002

Unplanned 15/02/2019 03:30 - 15/02/2019 11:00

Technical Capacity: 134,67 GWh/d Unavailable Capacity: 134,67 GWh/d Available Capacity: 0,00 GWh/d

Do to equipment failure

Problem is solved.


15-2-2019 03:34:10 Revision: 1
GRIJPSKE-0007482647190215_001
Unplanned 15/02/2019 03:30 - 15/02/2019 18:00

Technical Capacity: 134,67 GWh/d Unavailable Capacity: 134,67 GWh/d Available Capacity: 0,00 GWh/d

Do to equipment failure

Problem will be solved most likely before the evening.


8-2-2019 18:30:44 Revision: 3

Inactive GRIJPSKE-0007482647190130_003

Unplanned 30/01/2019 19:45 - 08/02/2019 16:00

Technical Capacity: 134,67 GWh/d Unavailable Capacity: 134,67 GWh/d Available Capacity: 0,00 GWh/d

K-4101 unavailable due technical integrity.

Investigation has started.


31-1-2019 23:09:21 Revision: 2
GRIJPSKE-0007482647190130_002
Unplanned 30/01/2019 19:45 - 08/02/2019 20:00

Technical Capacity: 134,67 GWh/d Unavailable Capacity: 134,67 GWh/d Available Capacity: 0,00 GWh/d

K-4101 unavailable due technical integrity.

Investigation has started.


30-1-2019 20:50:06 Revision: 1
GRIJPSKE-0007482647190130_001
Unplanned 30/01/2019 19:45 - 01/02/2019 20:00

Technical Capacity: 134,67 GWh/d Unavailable Capacity: 134,67 GWh/d Available Capacity: 0,00 GWh/d

K-4101 unavailable due technical integrity.

Investigation has started.


7-8-2018 21:05:23 Revision: 2

Inactive GRIJPSKE-0007482647180807_002

Unplanned 07/08/2018 13:30 - 07/08/2018 22:00

Technical Capacity: 154,00 GWh/d Unavailable Capacity: 154,00 GWh/d Available Capacity: 0,00 GWh/d

GRKUGS down due to temperature problems ambient temp to high to run the plant.

If the ambient temperature drops it will be possible to start up again


7-8-2018 13:38:20 Revision: 1
GRIJPSKE-0007482647180807_001
Unplanned 07/08/2018 13:30 - 07/08/2018 22:00

Technical Capacity: 154,00 GWh/d Unavailable Capacity: 154,00 GWh/d Available Capacity: 0,00 GWh/d

GRKUGS down due to temperature problems ambient temp to high to run the plant.

If the ambient temperature drops it will be possible to start up again


31-7-2018 11:23:00 Revision: 3

Inactive GRIJPSKE-0007482636180802_003

Unplanned 31/07/2018 09:00 - 31/07/2018 11:30

Technical Capacity: 157,00 GWh/d Unavailable Capacity: 157,00 GWh/d Available Capacity: 0,00 GWh/d

Power failure by external party.t

Plant has gone into emergency shut-down.t


31-7-2018 10:41:00 Revision: 2
GRIJPSKE-0007482636180802_002
Unplanned 31/07/2018 09:00 - 31/07/2018 12:00

Technical Capacity: 157,00 GWh/d Unavailable Capacity: 157,00 GWh/d Available Capacity: 0,00 GWh/d

Power failure by external party.t

Plant has gone into emergency shut-down.t


31-7-2018 09:37:00 Revision: 1
GRIJPSKE-0007482636180802_001
Unplanned 31/07/2018 09:00 - 31/07/2018 11:00

Technical Capacity: 157,00 GWh/d Unavailable Capacity: 157,00 GWh/d Available Capacity: 0,00 GWh/d

Power failure by external party.t

Plant has gone into emergency shut-down.t


28-7-2018 05:06:00 Revision: 3

Inactive GRIJPSKE-0007482633180803_003

Unplanned 27/07/2018 13:00 - 28/07/2018 05:00

Technical Capacity: 157,00 GWh/d Unavailable Capacity: 157,00 GWh/d Available Capacity: 0,00 GWh/d

GRKUGS down due to temperature problems ambient temp to high to run the plant.t

If the ambient temperature drops it will be possible to start up again.t


27-7-2018 23:44:00 Revision: 2
GRIJPSKE-0007482633180803_002
Unplanned 27/07/2018 13:00 - 28/07/2018 05:00

Technical Capacity: 157,00 GWh/d Unavailable Capacity: 157,00 GWh/d Available Capacity: 0,00 GWh/d

GRKUGS down due to temperature problems ambient temp to high to run the plant.t

If the ambient temperature drops it will be possible to start up again.t


27-7-2018 12:28:00 Revision: 1
GRIJPSKE-0007482633180803_001
Unplanned 27/07/2018 13:00 - 28/07/2018 00:00

Technical Capacity: 157,00 GWh/d Unavailable Capacity: 157,00 GWh/d Available Capacity: 0,00 GWh/d

GRKUGS down due to temperature problems ambient temp to high to run the plant.t

If the ambient temperature drops it will be possible to start up again.t


27-7-2018 02:05:00 Revision: 4

Inactive GRIJPSKE-0007482643180802_004

Unplanned 26/07/2018 15:00 - 27/07/2018 03:00

Technical Capacity: 157,00 GWh/d Unavailable Capacity: 157,00 GWh/d Available Capacity: 0,00 GWh/d

Unexpected heat issues due to outside temperature.t

Expected to be able to start again when environment temperature goes down.t


26-7-2018 23:29:00 Revision: 3
GRIJPSKE-0007482643180802_003
Unplanned 26/07/2018 15:00 - 27/07/2018 03:00

Technical Capacity: 157,00 GWh/d Unavailable Capacity: 157,00 GWh/d Available Capacity: 0,00 GWh/d

Unexpected heat issues due to outside temperature.t

Expected to be able to start again when environment temperature goes down.t


26-7-2018 20:01:00 Revision: 2
GRIJPSKE-0007482643180802_002
Unplanned 26/07/2018 15:00 - 27/07/2018 01:00

Technical Capacity: 157,00 GWh/d Unavailable Capacity: 157,00 GWh/d Available Capacity: 0,00 GWh/d

Unexpected heat issues due to outside temperature.t

Expected to be able to start again when environment temperature goes down.t


26-7-2018 14:04:00 Revision: 1
GRIJPSKE-0007482643180802_001
Unplanned 26/07/2018 15:00 - 26/07/2018 19:00

Technical Capacity: 157,00 GWh/d Unavailable Capacity: 157,00 GWh/d Available Capacity: 0,00 GWh/d

Unexpected heat issues due to outside temperature.t

Expected to be able to start again when environment temperature goes down.t


12-7-2018 20:31:00 Revision: 3

Inactive GRIJPSKE-0007482628180724_003

Unplanned 12/07/2018 17:30 - 12/07/2018 21:00

Technical Capacity: 163,85 GWh/d Unavailable Capacity: 163,85 GWh/d Available Capacity: 0,00 GWh/d

Compressor is down.

Unknown, further investigation.


12-7-2018 20:05:00 Revision: 2
GRIJPSKE-0007482628180724_002
Unplanned 12/07/2018 17:30 - 12/07/2018 21:00

Technical Capacity: 163,85 GWh/d Unavailable Capacity: 163,85 GWh/d Available Capacity: 0,00 GWh/d

Compressor is down.

Unknown, further investigation.


12-7-2018 17:42:00 Revision: 1
GRIJPSKE-0007482628180724_001
Unplanned 12/07/2018 17:30 - 12/07/2018 21:00

Technical Capacity: 163,85 GWh/d Unavailable Capacity: 163,85 GWh/d Available Capacity: 0,00 GWh/d

Compressor is down.

Unknown, further investigation.


3-7-2018 01:46:00 Revision: 4

Inactive GRIJPSKE-0007482630180724_004

Unplanned 02/07/2018 23:30 - 03/07/2018 02:10

Technical Capacity: 164,00 GWh/d Unavailable Capacity: 164,00 GWh/d Available Capacity: 0,00 GWh/d

Compressor tripped for unknown reasons.

Mechanic is on his way to the location Grijpskerk. After analyzing the failure we expected to start up around midnight.


2-7-2018 23:33:00 Revision: 3
GRIJPSKE-0007482630180724_003
Unplanned 02/07/2018 23:30 - 03/07/2018 03:00

Technical Capacity: 164,00 GWh/d Unavailable Capacity: 164,00 GWh/d Available Capacity: 0,00 GWh/d

Compressor tripped for unknown reasons.

Mechanic is on his way to the location Grijpskerk. After analyzing the failure we expected to start up around midnight.


2-7-2018 23:24:00 Revision: 2
GRIJPSKE-0007482630180724_002
Unplanned 02/07/2018 23:30 - 03/07/2018 03:00

Technical Capacity: 164,00 GWh/d Unavailable Capacity: 164,00 GWh/d Available Capacity: 0,00 GWh/d

Compressor tripped for unknown reasons.

Mechanic is on his way to the location Grijpskerk. After analyzing the failure we expected to start up around midnight.


2-7-2018 22:03:00 Revision: 1
GRIJPSKE-0007482630180724_001
Unplanned 02/07/2018 23:30 - 03/07/2018 03:00

Technical Capacity: 164,00 GWh/d Unavailable Capacity: 164,00 GWh/d Available Capacity: 0,00 GWh/d

Compressor tripped for unknown reasons.

Mechanic is on his way to the location Grijpskerk. After analyzing the failure we expected to start up around midnight.


5-6-2018 16:47:00 Revision: 2

Inactive GRIJPSKE-0007482634180724_002

Unplanned 05/06/2018 15:00 - 05/06/2018 16:00

Technical Capacity: 172,00 GWh/d Unavailable Capacity: 172,00 GWh/d Available Capacity: 0,00 GWh/d

Compressor has stopped while changing over the lube oil pumps. After cooling down the compressor it has started again.

Pending investigation


5-6-2018 15:21:00 Revision: 1
GRIJPSKE-0007482634180724_001
Unplanned 05/06/2018 15:00 - 05/06/2018 16:00

Technical Capacity: 172,00 GWh/d Unavailable Capacity: 172,00 GWh/d Available Capacity: 0,00 GWh/d

Compressor has failed for unknown reasons

Pending investigation


9-5-2018 10:50:00 Revision: 14

Inactive GRIJPSKE-0007482647180724_014

Unplanned 05/05/2018 19:20 - 09/05/2018 11:50

Technical Capacity: 174,00 GWh/d Unavailable Capacity: 174,00 GWh/d Available Capacity: 0,00 GWh/d

Unavailability of the injection now included in updated weekplan 19 (rev 5)

Unavailability of the injection now included in updated weekplan 19 (rev 5)


8-5-2018 11:23:00 Revision: 13
GRIJPSKE-0007482647180724_013
Unplanned 05/05/2018 19:20 - 10/05/2018 17:00

Technical Capacity: 174,00 GWh/d Unavailable Capacity: 174,00 GWh/d Available Capacity: 0,00 GWh/d

Unexpected trip K4101 ( injection compressor)

Further investigation on issue VSDS system. Expected repair and start-up at end of afternoon on Thursday. During the day one or more test-runs can be performed prior to start-up.


8-5-2018 09:31:00 Revision: 12
GRIJPSKE-0007482647180724_012
Unplanned 05/05/2018 19:20 - 09/05/2018 19:00

Technical Capacity: 174,00 GWh/d Unavailable Capacity: 174,00 GWh/d Available Capacity: 0,00 GWh/d

Unexpected trip K4101 ( injection compressor)

Earlier start-ups unsuccesful and issue indentified to be more complex. Further investigation done and repairs to be performed.


7-5-2018 21:10:00 Revision: 11
GRIJPSKE-0007482647180724_011
Unplanned 05/05/2018 19:20 - 08/05/2018 19:00

Technical Capacity: 174,00 GWh/d Unavailable Capacity: 174,00 GWh/d Available Capacity: 0,00 GWh/d

Unexpected trip K4101 ( injection compressor)

Waiting for availability spare parts and repair on-site.


7-5-2018 16:51:00 Revision: 10
GRIJPSKE-0007482647180724_010
Unplanned 05/05/2018 19:20 - 07/05/2018 23:00

Technical Capacity: 174,00 GWh/d Unavailable Capacity: 174,00 GWh/d Available Capacity: 0,00 GWh/d

Unexpected trip K4101 ( injection compressor)

Waiting for availability spare parts and repair on-site.


7-5-2018 11:27:00 Revision: 9
GRIJPSKE-0007482647180724_009
Unplanned 05/05/2018 19:20 - 07/05/2018 16:00

Technical Capacity: 174,00 GWh/d Unavailable Capacity: 174,00 GWh/d Available Capacity: 0,00 GWh/d

Unexpected trip K4101 ( injection compressor)

Waiting for availability spare parts and repair on-site.


7-5-2018 09:53:00 Revision: 8
GRIJPSKE-0007482647180724_008
Unplanned 05/05/2018 19:20 - 08/05/2018 18:00

Technical Capacity: 174,00 GWh/d Unavailable Capacity: 174,00 GWh/d Available Capacity: 0,00 GWh/d

Unexpected trip K4101 ( injection compressor)

Waiting for availability spare parts and repair on-site.


6-5-2018 22:16:00 Revision: 7
GRIJPSKE-0007482647180724_007
Unplanned 05/05/2018 19:20 - 07/05/2018 12:00

Technical Capacity: 174,00 GWh/d Unavailable Capacity: 174,00 GWh/d Available Capacity: 0,00 GWh/d

Unexpected trip K4101 ( injection compressor)

Expected start-up depending on failure analyses.


6-5-2018 19:48:00 Revision: 6
GRIJPSKE-0007482647180724_006
Unplanned 05/05/2018 19:20 - 07/05/2018 01:00

Technical Capacity: 174,00 GWh/d Unavailable Capacity: 174,00 GWh/d Available Capacity: 0,00 GWh/d

Unexpected trip K4101 ( injection compressor)

Expected start-up depending on failure analyses.


6-5-2018 19:46:00 Revision: 5
GRIJPSKE-0007482647180724_005
Unplanned 05/05/2018 19:20 - 07/05/2018 01:50

Technical Capacity: 174,00 GWh/d Unavailable Capacity: 174,00 GWh/d Available Capacity: 0,00 GWh/d

Unexpected trip K4101 ( injection compressor)

Expected start-up depending on failure analyses.


6-5-2018 17:10:00 Revision: 4
GRIJPSKE-0007482647180724_004
Unplanned 05/05/2018 19:20 - 06/05/2018 20:00

Technical Capacity: 174,00 GWh/d Unavailable Capacity: 174,00 GWh/d Available Capacity: 0,00 GWh/d

Unexpected trip K4101 ( injection compressor)

Expected start-up depending on failure analyses.


6-5-2018 03:30:00 Revision: 3
GRIJPSKE-0007482647180724_003
Unplanned 05/05/2018 19:20 - 06/05/2018 15:00

Technical Capacity: 174,00 GWh/d Unavailable Capacity: 174,00 GWh/d Available Capacity: 0,00 GWh/d

Unexpected trip K4101 ( injection compressor)

Expected start-up depending on failure analyses.


6-5-2018 00:52:00 Revision: 2
GRIJPSKE-0007482647180724_002
Unplanned 05/05/2018 19:20 - 06/05/2018 06:00

Technical Capacity: 174,00 GWh/d Unavailable Capacity: 174,00 GWh/d Available Capacity: 0,00 GWh/d

Unexpected trip K4101 ( injection compressor)

Expected start-up depending on failure analyses.


5-5-2018 19:46:00 Revision: 1
GRIJPSKE-0007482647180724_001
Unplanned 05/05/2018 19:20 - 06/05/2018 00:00

Technical Capacity: 174,00 GWh/d Unavailable Capacity: 174,00 GWh/d Available Capacity: 0,00 GWh/d

Unexpected trip K4101 ( injection compressor)

Expected start-up depending on failure analyses.


5-3-2018 16:35:00 Revision: 5

Inactive GRIJPSKE-0007482615180412_005

Unplanned 01/03/2018 02:00 - 05/03/2018 15:00

Technical Capacity: 495,00 GWh/d Unavailable Capacity: 180,00 GWh/d Available Capacity: 315,00 GWh/d

An unexpected trip of HIPPS/3 wells is causing a reduced capacity of the UGS Grijpskerk withdrawal

Expected to startup the wells again is not expected before the 5th of March 14.00h(GMT).


3-3-2018 15:12:00 Revision: 4
GRIJPSKE-0007482615180412_004
Unplanned 01/03/2018 02:00 - 03/03/2018 15:00

Technical Capacity: 495,00 GWh/d Unavailable Capacity: 180,00 GWh/d Available Capacity: 315,00 GWh/d

An unexpected trip of HIPPS/3 wells is causing a reduced capacity of the UGS Grijpskerk withdrawal

Expected to startup the wells again is not expected before the 2nd of March 14.00h(GMT).


2-3-2018 13:17:00 Revision: 3
GRIJPSKE-0007482615180412_003
Unplanned 01/03/2018 02:00 - 02/03/2018 15:00

Technical Capacity: 495,00 GWh/d Unavailable Capacity: 180,00 GWh/d Available Capacity: 315,00 GWh/d

An unexpected trip of HIPPS/3 wells is causing a reduced capacity of the UGS Grijpskerk withdrawal

Expected to startup the wells again is not expected before the 2nd of March 14.00h(GMT).


1-3-2018 10:03:00 Revision: 2
GRIJPSKE-0007482615180412_002
Unplanned 01/03/2018 02:00 - 01/03/2018 15:00

Technical Capacity: 495,00 GWh/d Unavailable Capacity: 180,00 GWh/d Available Capacity: 315,00 GWh/d

An unexpected trip of HIPPS/3 wells is causing a reduced capacity of the UGS Grijpskerk withdrawal

Expected to startup the wells again is not expected before the 2nd of March 14.00h(GMT).


1-3-2018 02:03:00 Revision: 1
GRIJPSKE-0007482615180412_001
Unplanned 01/03/2018 02:00 - 01/03/2018 11:00

Technical Capacity: 495,00 GWh/d Unavailable Capacity: 180,00 GWh/d Available Capacity: 315,00 GWh/d

An unexpected trip of HIPPS/3 wells is causing a reduced capacity of the UGS Grijpskerk withdrawal

Expected to startup the wells again is not expected before tomorrow 10:00hr (GMT).


1-3-2018 01:29:00 Revision: 2

Inactive GRIJPSKE-0007482620180412_002

Unplanned 28/02/2018 23:00 - 01/03/2018 01:30

Technical Capacity: 495,00 GWh/d Unavailable Capacity: 180,00 GWh/d Available Capacity: 315,00 GWh/d

An unexpected trip of 3 wells is causing a reduced capacity of the UGS Grijpskerk withdrawal.

Expected to startup the wells again within the hour. Update: 00:30(GMT) evry thing is up and running.


28-2-2018 22:09:00 Revision: 1
GRIJPSKE-0007482620180412_001
Unplanned 28/02/2018 23:00 - 01/03/2018 00:00

Technical Capacity: 495,00 GWh/d Unavailable Capacity: 180,00 GWh/d Available Capacity: 315,00 GWh/d

An unexpected trip of 3 wells is causing a reduced capacity of the UGS Grijpskerk withdrawal.

Expected to startup the wells again within the hour. Update: 00:30(GMT) evry thing is up and running.


23-10-2017 10:06:00 Revision: 2

Inactive GRIJPSKE-0007482622180412_002

Unplanned 20/10/2017 22:00 - 25/10/2017 18:00

Technical Capacity: 701,83 GWh/d Unavailable Capacity: 161,96 GWh/d Available Capacity: 539,87 GWh/d

Flow line / manifold blocked in and made pressureless for maintenance (small leakage)on monday.

Monday they will start with reparing the small leakage. Changed in scheduled unavailability.


21-10-2017 08:25:00 Revision: 1
GRIJPSKE-0007482622180412_001
Unplanned 20/10/2017 22:00 - 23/10/2017 14:00

Technical Capacity: 701,83 GWh/d Unavailable Capacity: 161,96 GWh/d Available Capacity: 539,87 GWh/d

Flow line / manifold blocked in and made pressureless for maintenance (small leakage)on monday.

Monday they will start with reparing the small leakage.


9-9-2017 10:53:00 Revision: 5

Inactive GRIJPSKE-0007482626180412_005

Unplanned 08/09/2017 22:20 - 09/09/2017 11:00

Technical Capacity: 139,49 GWh/d Unavailable Capacity: 139,49 GWh/d Available Capacity: 0,00 GWh/d

Injection compressor has tripped for unknown electrical reason

Electrical engineer on his way to the installation.


9-9-2017 08:13:00 Revision: 4
GRIJPSKE-0007482626180412_004
Unplanned 08/09/2017 22:20 - 09/09/2017 13:00

Technical Capacity: 139,49 GWh/d Unavailable Capacity: 139,49 GWh/d Available Capacity: 0,00 GWh/d

Injection compressor has tripped for unknown electrical reason

Electrical engineer on his way to the installation.


9-9-2017 04:28:00 Revision: 3
GRIJPSKE-0007482626180412_003
Unplanned 08/09/2017 22:20 - 09/09/2017 09:00

Technical Capacity: 139,49 GWh/d Unavailable Capacity: 139,49 GWh/d Available Capacity: 0,00 GWh/d

Injection compressor has tripped for unknown electrical reason

Electrical engineer on his way to the installation.


9-9-2017 00:39:00 Revision: 2
GRIJPSKE-0007482626180412_002
Unplanned 08/09/2017 22:20 - 09/09/2017 04:00

Technical Capacity: 139,49 GWh/d Unavailable Capacity: 139,49 GWh/d Available Capacity: 0,00 GWh/d

Injection compressor has tripped for unknown electrical reason

Electrical engineer on his way to the installation.


8-9-2017 22:49:00 Revision: 1
GRIJPSKE-0007482626180412_001
Unplanned 08/09/2017 22:20 - 09/09/2017 00:20

Technical Capacity: 139,49 GWh/d Unavailable Capacity: 139,49 GWh/d Available Capacity: 0,00 GWh/d

Injection compressor has tripped for unknown electrical reason

Electrical engineer on his way to the installation.


30-8-2017 16:23:00 Revision: 2

Inactive GRIJPSKE-0007482628180412_002

Unplanned 30/08/2017 15:00 - 30/08/2017 17:00

Technical Capacity: 144,00 GWh/d Unavailable Capacity: 144,00 GWh/d Available Capacity: 0,00 GWh/d

Issues with the compressor.

problems solved.


30-8-2017 14:40:00 Revision: 1
GRIJPSKE-0007482628180412_001
Unplanned 30/08/2017 15:00 - 30/08/2017 18:30

Technical Capacity: 144,00 GWh/d Unavailable Capacity: 144,00 GWh/d Available Capacity: 0,00 GWh/d

Issues with the compressor.

As of yet the exact cause is unknown, so the event stop time can shift.


25-7-2017 13:48:00 Revision: 4

Inactive GRIJPSKE-0007482633180412_004

Unplanned 25/07/2017 10:40 - 25/07/2017 13:30

Technical Capacity: 151,86 GWh/d Unavailable Capacity: 151,86 GWh/d Available Capacity: 0,00 GWh/d

Injection compressor has tripped

reset takes approx 2 hours


25-7-2017 13:29:00 Revision: 3
GRIJPSKE-0007482633180412_003
Unplanned 25/07/2017 10:40 - 25/07/2017 13:30

Technical Capacity: 151,86 GWh/d Unavailable Capacity: 151,86 GWh/d Available Capacity: 0,00 GWh/d

Injection compressor has tripped

reset takes approx 2 hours


25-7-2017 10:59:00 Revision: 2
GRIJPSKE-0007482633180412_002
Unplanned 25/07/2017 10:40 - 25/07/2017 13:30

Technical Capacity: 151,86 GWh/d Unavailable Capacity: 151,86 GWh/d Available Capacity: 0,00 GWh/d

Injection compressor has tripped

reset takes approx 2 hours


25-7-2017 10:56:00 Revision: 1
GRIJPSKE-0007482633180412_001
Unplanned 25/07/2017 10:40 - 25/07/2017 12:40

Technical Capacity: 151,86 KWh/d Unavailable Capacity: 6327656,00 KWh/d Available Capacity: 0,00 KWh/d

Injection compressor has tripped

reset takes approx 2 hours


17-7-2017 07:46:00 Revision: 4

Inactive GRIJPSKE-0007482636180412_004

Unplanned 16/07/2017 17:00 - 17/07/2017 00:00

Technical Capacity: 161,96 GWh/d Unavailable Capacity: 161,96 GWh/d Available Capacity: 0,00 GWh/d

Under investigation, compressor related.

Under investigation, compressor related.


16-7-2017 23:57:00 Revision: 3
GRIJPSKE-0007482636180412_003
Unplanned 16/07/2017 17:00 - 17/07/2017 00:00

Technical Capacity: 161,96 GWh/d Unavailable Capacity: 161,96 GWh/d Available Capacity: 0,00 GWh/d

Under investigation, compressor related.

Under investigation, compressor related.


16-7-2017 21:34:00 Revision: 2
GRIJPSKE-0007482636180412_002
Unplanned 16/07/2017 17:00 - 17/07/2017 00:00

Technical Capacity: 161,96 GWh/d Unavailable Capacity: 161,96 GWh/d Available Capacity: 0,00 GWh/d

Under investigation, compressor related.

Under investigation, compressor related.


16-7-2017 17:03:00 Revision: 1
GRIJPSKE-0007482636180412_001
Unplanned 16/07/2017 17:00 - 16/07/2017 20:00

Technical Capacity: 161,96 GWh/d Unavailable Capacity: 161,96 GWh/d Available Capacity: 0,00 GWh/d

Under investigation, compressor related.

Under investigation, compressor related.


29-6-2017 21:01:00 Revision: 2

Inactive GRIJPSKE-0007482639180412_002

Unplanned 29/06/2017 17:10 - 29/06/2017 20:10

Technical Capacity: 16,76 GWh/d Unavailable Capacity: 16,76 GWh/d Available Capacity: 0,00 GWh/d

Unavailable due to powerfail compressor

Startup compressor cylus estimated time one hour


29-6-2017 18:09:00 Revision: 1
GRIJPSKE-0007482639180412_001
Unplanned 29/06/2017 17:10 - 29/06/2017 18:30

Technical Capacity: 16,76 GWh/d Unavailable Capacity: 16,76 GWh/d Available Capacity: 0,00 GWh/d

Unavailable due to powerfail compressor

Startup compressor cylus estimated time one hour


1-6-2017 08:10:00 Revision: 2

Inactive GRIJPSKE-0007482641180412_002

Unplanned 31/05/2017 16:20 - 01/06/2017 01:10

Technical Capacity: 168,71 GWh/d Unavailable Capacity: 168,71 GWh/d Available Capacity: 0,00 GWh/d

Technical problem with compressor.

Issue has been solved.


31-5-2017 16:48:00 Revision: 1
GRIJPSKE-0007482641180412_001
Unplanned 31/05/2017 16:20 - 31/05/2017 21:00

Technical Capacity: 168,71 GWh/d Unavailable Capacity: 168,71 GWh/d Available Capacity: 0,00 GWh/d

Technical problem with compressor.

Technical Support is NOT on site yet, but has just been informed and travelling to the location.


7-12-2016 18:00:00 Revision: 1

Inactive GRIJPSKE-0007482642180412_001

Unplanned 07/12/2016 17:40 - 16/12/2016 17:00

Technical Capacity: 247,44 GWh/d Unavailable Capacity: 247,44 GWh/d Available Capacity: 0,00 GWh/d

Gas quality restrictions

Resolved


4-12-2016 00:30:00 Revision: 1

Inactive GRIJPSKE-0007482643180412_001

Unplanned 04/12/2016 00:00 - 04/12/2016 18:00

Technical Capacity: 191,20 GWh/d Unavailable Capacity: 191,20 GWh/d Available Capacity: 0,00 GWh/d

Gas quality restrictions.

Resolved.


8-11-2016 18:50:00 Revision: 1

Inactive NORG-NAM-0007482645180412_001

Unplanned 08/11/2016 18:20 - 08/11/2016 22:00

Technical Capacity: 440,00 GWh/d Unavailable Capacity: 440,00 GWh/d Available Capacity: 0,00 GWh/d

Not given, this is a pre 01-01-17 message

Not given, this is a pre 01-01-17 message


15-8-2016 04:55:00 Revision: 2

Inactive GRIJPSKE-0007482647180412_002

Unplanned 15/08/2016 04:30 - 15/08/2016 10:00

Technical Capacity: 123,72 GWh/d Unavailable Capacity: 123,72 GWh/d Available Capacity: 0,00 GWh/d

Not given, this is a pre 01-01-17 message

Not given, this is a pre 01-01-17 message


15-8-2016 04:45:00 Revision: 1
GRIJPSKE-0007482647180412_001
Unplanned 15/08/2016 04:30 - 15/08/2016 10:00

Technical Capacity: 123,72 GWh/d Unavailable Capacity: 123,72 GWh/d Available Capacity: 0,00 GWh/d

Not given, this is a pre 01-01-17 message

Not given, this is a pre 01-01-17 message


2-11-2021 13:48:04 Revision: 2

Dismissed NORG-NAM0000000000211029_002

Unplanned 29/10/2021 13:06 - 30/10/2021 13:08

Technical Capacity: 10,00 GWh/d Unavailable Capacity: 0,00 GWh/d Available Capacity: 10,00 GWh/d

This UMM was placed unintentionally. Submitted by testing a new system connection (GIE).

This UMM was placed unintentionally. Submitted by testing a new system connection (GIE).


29-10-2021 13:08:30 Revision: 1
NORG-NAM0000000000211029_001
Unplanned 29/10/2021 13:06 - 30/10/2021 13:08

Technical Capacity: 10,00 GWh/d Unavailable Capacity: 0,00 GWh/d Available Capacity: 10,00 GWh/d

reason

remarks


29-7-2021 14:34:57 Revision: 2

Dismissed GRIJPSKE0000000000210729_002

Unplanned 29/07/2021 16:00 - 29/07/2021 16:05

Technical Capacity: 162,72 GWh/d Unavailable Capacity: 1,00 GWh/d Available Capacity: 161,72 GWh/d

Only for test purposes IT system, no actual unavailability for injection side GRK.

TEST COMPLETED


29-7-2021 14:33:49 Revision: 1
GRIJPSKE0000000000210729_001
Unplanned 29/07/2021 16:00 - 29/07/2021 16:05

Technical Capacity: 162,72 GWh/d Unavailable Capacity: 1,00 GWh/d Available Capacity: 161,72 GWh/d

Only for test purposes IT system, no actual unavailability for injection side GRK.

TEST